Engineering Specifications & Installation/Operating Instructions Two Stage Split System Air Handler Unit FS3-x-2xV thru FS5-
8 down after the run time is complete. Ramping of the ECM motor allows for quieter operation and increased comfort. It may take a few seconds for
9 4. Run the system through all modes of operation in the thermostat instructions to ensure correct operation. If you have additional q
10 XII. TROUBLESHOOTING GUIDE FOR ECM BLOWER PROBLEM CHECKS AND CORRECTIONS Motor rocks slightly when starting •This is normal start-up for ECM. Motor
XIII. ADDITONAL FIGURES, TABLES, and APPENDICIES Figure 1 – Installation Illustrations (Note: Conceptual drawings only) PumpPAKAir PadPressure/Tem
12 XIV. WIRING DIAGRAMS Wiring Diagram, Vara 2 Plus Split Air Handler Models [FSx-1-2xV]1-PhasePowerBluFSx-x-2xV (Variable Speed Blower)Air Handle
Greenville, IL & Mitchell, SD [email protected] www.gogogeo.com 90-1093 Rev A (2011-008) | ©2012 Enertech
Two Stage Air Handler Unit
TABLE OF CONTENTS Section Title Page I. Introduction to ECONAR Heat Pumps 2 II. Applications 3 III. Available Models Capacity Ratings, Configura
I. INTRODUCTION TO ECONAR HEAT PUMPS Enertech Global, LLC, is home to ECONAR geothermal heat pumps, a brand that has been in Minnesota for
II. APPLICATIONS ECONAR Split System geothermal heat pumps consist of an Air Handler Unit (AHU) and a fully-charged Compressor Unit (CU) to offer
4 Physical Data Description FS3 or 4 FS5 Expansion Device – Thermostatic 4-ton 5-ton Air Coil Type – High Density A-Coil 4.44 Ft2, 15fpi Quantity of A
5 IV. UNIT LOCATION / INSTALLATION Inspect for shipping damage immediately at delivery, and file claims immediately with the shipping compan
6 C. Evacuation and Testing After initial purging with nitrogen during and after brazing, and with the Service Valves on the CU in the ship
7 VI. ELECTRICAL SERVICE Note – Always refer to the inside of the electrical box cover for the correct wiring diagram, and always refer
Comentários a estes Manuais